DS1140 control plan template: what it must contain, and when an app is better
Published
A DS1140 control plan template gives you the structure for the B2 control plan: control sections, control points, control type, control level, scope, documentation requirements and who is responsible. What it can't do is decide your structural class, choose the control points your project actually needs or keep itself current as work progresses. A spreadsheet template can be enough for a single, simple project; with several trades, several projects or a longer build, an app where controls are registered on site is usually the better tool.
What a DS1140 control plan is
DS 1140:2019 governs the general control (almen kontrol) of the execution of load-bearing structures: planning the control, carrying it out, documenting it and following up. In the structure used by SBi Guideline 271, the control plan is document B2, the control report that documents what was actually checked is B3, and A5 is the as-built documentation.
The control plan is project-specific. Under BR18, the control type depends on the structural class: KK1 requires self-control, KK2 adds internal independent control, KK3 external independent control, and KK4 third-party control as well. The scope of control is set for the individual project, per control section and execution class. It can't be reduced to a fixed percentage per structural class.
What a control plan template must contain
A useful template has a field for everything BR18 expects a control plan to state, so nothing is forgotten:
- Control sections and structural parts: what is being controlled, such as foundations, concrete, steel or timber structures.
- Control points: each individual thing to be checked, with a reference to the drawing or specification it is checked against.
- Control type and control level: self-control, independent or third-party control, as the structural class requires.
- Scope: how much is checked: every element or a sample.
- Documentation requirements: photo, measurement, checklist or signature.
- Responsibility: the organisations and persons who carry out each control.
- Status and date: so the plan shows what has been checked and what is outstanding.
BR18 also requires the control plan to be kept current with the stage of construction. That last requirement is where most templates struggle.
What a generic template can't do for you
A template you find online, free or not, is a general starting point. It doesn't know:
- Your structural class. It can't tell you whether the building is KK2 or KK3, or what that means for control type and scope. That is established in the project's structural documentation.
- Your project-specific control points. It lists typical points, not the ones your design, materials and construction method require. A template written for a lower structural class rarely covers what a higher one needs.
- Whether it is up to date. Check who wrote it and when. An old template may miss points that have become relevant since.
- What has actually been done. Someone has to enter every completed control, match it against the plan and assemble the B3 control report at the end.
When a spreadsheet template is enough
For a single, short project in a low structural class, where one person has the full overview and does most of the control, a well-adapted spreadsheet template works fine. The manual upkeep is manageable, and filling one in is a good way to learn what a control plan needs to contain.
It gets harder when the project runs for months, when several trade contractors each document their own control points in the same file, or when you have several projects running at once. The risk then grows that someone forgets to update the plan, that two people work in different copies, or that photos and comments end up somewhere other than the plan they belong to.
When an app is better
An app records each control as it is carried out (on the phone, on site, with photo and comment), and everyone on the project works in the same plan instead of separate copies. Status is visible as soon as a control is registered, and the report is built from those registrations rather than assembled by hand at handover. For a fuller comparison, see DS1140 app vs manual documentation.
Control plans built into Lite Report
Assurement doesn't offer downloadable templates. Instead, control plans come built into Lite Report, which is available today:
- When the project manager sets up a report on the web, they choose a profession, and the control plans and control points for that trade load.
- You adapt the control points to the project and add your own company or custom control points.
- Workers see their tasks on the phone (control plan, control type, control point number, activity and building parts) and document them with photos stamped with date, time and GPS position.
- If a task slips, the crew raises a time deviation with a new completion date, or the system raises one automatically when a milestone passes.
Lite Report supports your documentation, but it doesn't replace the project-specific control plan required under BR18 and DS 1140. Its export can serve as photo documentation in a DS 1140 case, for example supporting the B3 control report. Documenting is free; you pay 149 DKK excl. VAT (186.25 DKK incl. VAT) per finished report.
The DS1140 module
The DS1140 module is in development and not available yet. It is being built for structural documentation in KK1–KK4: project-supporting control plan templates that you adapt to the project's execution basis, control sections and execution class, tracking of the control scope, control registration reports and access for independent inspectors. Price and launch date will be announced at launch.
When to get professional help
Neither a template nor an app establishes your structural class or judges whether your control scope is sufficient. That takes professional judgement. In KK3 and KK4, a certified structural engineer (certificeret statiker) must be involved in the structural documentation. If you're unsure, or a control plan has been sent back for revision, our sister company KS Danmark prepares DS 1140 documentation for contractors (the B2 control plan, the B3 control report and A5 as-built) and can act as independent inspector.
Frequently asked questions
Can I download a free DS1140 template from Assurement?
No. Assurement doesn't offer downloadable templates. Lite Report comes with built-in control plans and control points per profession, which you adapt to your project. Creating an account and documenting is free; you pay only for a finished report.
Is a free template enough for a whole building project?
For a single, simple project it can be. With several trades, several projects or a longer build, keeping a spreadsheet current by hand becomes time-consuming and error-prone.
Can I import my existing spreadsheet template into the app?
No. Spreadsheets and templates can't be imported. You set up the control plan in the app by choosing a profession, adapting its control points and adding your own.
Is there a difference between templates for KK1 and KK4?
The structure can be similar, but the content can't. Control type, control level and scope depend on the structural class and the project, so a template must always be adapted.
Who decides our structural class?
It is established in the project's structural documentation, normally by the structural engineer. If you're in doubt, get it clarified before you build your control plan. KS Danmark can help.
Does Lite Report replace the DS1140 control plan?
No. Lite Report supports your company's documentation, and its export can serve as photo documentation in a DS 1140 case, but the project-specific control plan and the formal DS 1140 approval remain separate.