Digital DS1140 Control and Documentation

Control plan templates, automatic documentation tracking and control registration reports for construction classes KK1–KK4.

app.assurement.dk

Control plan overview

48

Control Points

41

Verified

85%

Progress

KK3Jacksonville · Foundation
26/30✓
KK2Harbor View · Steel
14/16✓
KK4Civic Center · Precast
38/60Pending

DS1140 module: status and price

The DS1140 module is launching soon and is not available yet. It is a digital module for structuring and documenting the DS1140 process, from the control plan and control registrations to deviations, communication and reporting. The price is 7,500 DKK excl. VAT per construction section (konstruktionsafsnit), as a one-off price, and at 10 projects within one year you receive a credit note of 15,000 DKK. Until the module launches, you can document controls on site with Lite Report, which is available today.

KK1
Simple structures
Self-control (egenkontrol)
KK2
Standard buildings
Self-control + internal independent control
KK3
Complex structures
Self-control + external independent control
KK4
High-consequence
+ third-party control

Control type per BR18 Appendix 3, Table 1. The scope of control, including any sample size for special control of the executed structure, is set for the individual project in its control plan, per control section and execution class, in accordance with BR18 (Appendix 3, Tables 2a and 2b) and DS 1140:2019. It cannot be reduced to a fixed percentage per construction class.

Report Types

Complete DS1140 documentation suite, from control planning to final registration.

Control Plan Report

Project-supporting control plan templates that must be adapted to the specific execution basis, control section, execution class and project requirements. Define control points, assign responsible persons, and set the documentation scope.

Control Registration Report

Document each control with evidence, measurements and status. Tracks your documentation scope against the requirement set for the project.

Independent Inspection Report

Supervision reports documenting the control performed, with evidence, deviations and follow-up, structured per DS 1140:2019 and the project's control plan.

Project-supporting control plan templates that must be adapted to the specific execution basis, control section, execution class and project requirements.

Developed based on current BR18, DS 1140:2019, relevant execution standards and the project's control plans.

Under BR18 § 523(3) a control plan must state the control type, the control level, the scope and the documentation requirements, and identify the organisations and persons carrying out the control. It must be kept current with the stage of construction.

9:41
Assurement
Jacksonville
KK3

Control Plans

Select plan to inspect

Foundation · Concrete

4 control points

2/4 done

Steel Frame · Connections

6 control points

Not started

Precast · Joints

3 control points

Complete

Inspect and Document On-Site

Follow the project's control plan step by step on your phone. Capture evidence, mark control points on drawings, and track progress in real time.

  • Project-supporting control plan templates
  • KK1-KK4 construction class support
  • Automatic tracking of the project's control scope
  • Mark control points on structural drawings
  • Photo evidence with GPS and timestamps
  • Independent inspector access and workflow

Monitor Compliance Across All Projects

Track the project's control scope, review control registrations, and generate reports from the web dashboard. Real-time visibility for project managers and inspectors.

app.assurement.dk

Control plan overview

48

Control Points

41

Verified

85%

Progress

KK3Jacksonville · Foundation
26/30✓
KK2Harbor View · Steel
14/16✓
KK4Civic Center · Precast
38/60Pending

What you can do today

Status: launching soon. The price is 7,500 DKK excl. VAT per construction section (konstruktionsafsnit), as a one-off price. At 10 projects within one year, the customer receives a credit note of 15,000 DKK. Until launch, you can document on site with Lite Report.

Lite Report comes with professions, control plans and control points that you adapt to the job, and its photos are stamped with date, time, GPS position and place name. A finished Lite Report can serve as photo documentation in a DS 1140 case, for example to support the B3 control report. The formal DS 1140 documentation and approval remain a separate task.

Good to know: the app needs an internet connection today to register tasks and upload photos. Offline mode is on our roadmap.

App or advisory?

The DS1140 module is for contractors who want to create and maintain the control documentation themselves. If you would rather have an expert prepare it, check your control plan or act as independent inspector, our sister company KS Danmark is the advisory business. KS Danmark prepares B2 control plans, B3 control reports and A5 as-built documentation for contractors, and works with certified structural engineers across KK1–KK4.

In short: Assurement is the software you use yourselves; KS Danmark is the advice when you want an expert to do or check the work.

Do you need professional help with DS1140?

Assurement helps with the digital process and the documentation. If you need professional guidance on DS1140, responsibilities, control plans, control scope, independent control or project material, you can read the professional guides at Kvalitetssikring Danmark.

Frequently asked questions

Is the DS1140 module available now?

Not yet. The DS1140 module is launching soon. Lite Report is available today and can already be used to document controls on site with photos.

What is Assurement DS1140?

Assurement DS1140 is a digital module for structuring and documenting the DS1140 process. The module brings the control plan, control registrations, photo documentation, relevant documents, deviations, communication and reporting together in a process-driven workflow. It is launching soon.

Who is Assurement DS1140 built for?

The module is built for companies and people who work with DS1140 documentation, including executing contractors, project managers, self-inspectors, independent inspectors and the relevant project parties who need to follow or receive the documentation.

What do I get with Assurement DS1140?

The module supports the DS1140 flow around the construction section (konstruktionsafsnit) with B2, B3 self-inspection, B3 independent control, an A5-related documentation flow, photo documentation, relevant documents, a communication platform, a contact list and an approval flow.

Can I have several control sections under the same construction section?

Yes. Relevant control sections (kontrolafsnit) can be organised under the construction section, as long as the division follows the actual project and control basis.

How do I document the control in Assurement?

Control registrations can be gathered with relevant information, photos, references and measurements, so the documentation is tied to the specific control point and construction section.

Can Assurement handle self-inspection and independent control?

Yes. The module keeps the self-inspection registrations separate from the independent control and supports the relevant process and approval flow.

How does Assurement handle deviations?

Deviations can be registered and tracked in the system, so the issue, the documentation, the communication and the follow-up are gathered in the project's workflow.

Can I keep documents and contacts together in the DS1140 project?

Yes. Relevant documents and project contacts can be part of the module's project structure, so documentation and communication don't have to be handled as separate, loose trails of information.

How does the approval flow work?

Assurement supports a process-driven flow from the executing party and the control registrations, through the relevant control, and on to the project parties who need to receive, review or accept the documentation. The actual professional authority to approve is set by the project's organisation, not by the software.

Does Assurement approve that the structure has been built correctly?

No. Assurement structures the workflow and the documentation. The system does not replace the project material or the professional control, assessment and responsibility of the responsible parties.

What does Assurement DS1140 cost?

Assurement DS1140 costs 7,500 DKK excl. VAT per construction section, as a one-off price. Relevant control sections can be organised under the construction section in line with the project basis.

Is there a volume model?

Yes. At 10 projects within one year, the customer receives a credit note of 15,000 DKK.

DS1140 compliance made simple

The DS1140 module is launching soon, at a one-off price of 7,500 DKK excl. VAT per construction section. Until then, start documenting with Lite Report today.