Gebruikershandleiding

Gebruikershandleiding Lite Report

Elk scherm in Assurement Lite, stap voor stap, in de volgorde waarin je werkt. Lees hem hier, doorzoek hem, of download hem als PDF.

Download de volledige handleidingEnglish · PDF · 63 pagina's · 16,1 MB

De gebruikershandleiding is beschikbaar in het Engels en het Deens.

Taal van de handleiding
Assurement Lite user manual. Pagina 1 van 63
Pagina 1 van 63

Hoofdstuk 0 · Before you start

Assurement Lite user manual

Hoofdstukken

Open hier een hoofdstuk, of download het als aparte PDF.

00

Before you start

Pagina's 1–10

Contents, index, roles, permissions and how a report moves.

PDF openen1,3 MB
01

Sign up and log in

Pagina's 11–14

Create the company account, log in, reset your password and choose the language.

PDF openen0,9 MB
02

Master data

Pagina's 15–17

Professions, control plans and control points from Assurement.

PDF openen1,3 MB
03

Company settings

Pagina's 18–20

Company access and the default or extra profession.

PDF openen0,8 MB
04

Company dashboard and inviting your team

Pagina's 21–22

The company dashboard and how to invite users.

PDF openen0,9 MB
05

Create a site or project

Pagina's 23–29

The site wizard, licence, participants, invitations and the site list.

PDF openen3,4 MB
06

Site dashboard, documents and drawings

Pagina's 30–33

Upload documents and drawings, floor levels and professions for the site.

PDF openen1,2 MB
07

Create a report

Pagina's 34–40

The six-step report wizard.

PDF openen1,1 MB
08

Report overview and deviations

Pagina's 41–42

The report overview and following up on deviations.

PDF openen0,8 MB
09

Add tasks

Pagina's 43–49

Checklists, registrations, control points and Assign task.

PDF openen2,4 MB
10

Admin app

Pagina's 50–50

Follow every site from your phone.

PDF openen0,9 MB
11

Work in the field

Pagina's 51–53

The field user's app: tasks, photos, drawings and Submit.

PDF openen3,5 MB
12

Communication notes

Pagina's 54–55

Write, read and answer notes on a report.

PDF openen1,7 MB
13

Pay for a report

Pagina's 56–59

Invoices, the cart, card payment and the invoice PDF.

PDF openen1,3 MB
14

Get the final report

Pagina's 60–62

Preview, generate and download the report.

PDF openen1,1 MB
15

Quick reference

Pagina's 63–63

I want to… with the page for every common task.

PDF openen0,3 MB

Tekstversie

De volledige tekst van de handleiding, hoofdstuk voor hoofdstuk.

00

Before you start

Contents, index, roles, permissions and how a report moves.

How to use this manual

Every page is one screen of Assurement and one thing to do on it.

Orange ring and arrow

Where to click or type. The number matches the numbered step on the left.

Who

The role that does this step. R1 company admin, R2 project manager, R5 field user.

Where

How to get to the screen.

Next

What happens after, so you always know the following screen.

MOVING AROUND

Use the arrow keys or the buttons at the bottom. The numbers at the top jump to a chapter. Point at a step to highlight its arrow.

Who does what

Three internal roles hand the work on to each other. People outside the company join with a named external role.

R1

Company admin

The first user. Creates the company, sets the profession, invites the users and creates the sites.

ASingle-person company: the admin is the only user and carries every role.

BCompany with several users: the admin invites and manages internal and external users.

R2

Project manager

Runs the site. Uploads documents and drawings, creates the reports and defines the tasks for the people who carry them out.

R5

Field user

Picks up the open tasks on the reports they are on, does them on site with the phone app, and adds photo and drawing evidence. When all tasks are done, the report is complete.

External users

Invited per site with + Invite user (page 26). Their stakeholder type tells the report in which capacity they contribute.

  • Advisor
  • Architect
  • Certified structural engineer
  • Engineer
  • External construction manager
  • Project manager (company user)
  • Safety coordinator / representative
  • Structural designer
  • Subcontractor
  • Subcontractor employee
  • Sustainability coordinator
  • Third-party control
  • Waste responsible
  • Others

What people can do

Assurement uses three permissions. You set them when you invite someone (pages 22 and 26). They work the same for internal and external users.

ALWAYS ON

Read

Everyone can view the site, the report and its documents. Read only, nothing can be changed.

OPTIONAL

Communicate

Write in the communication notes of the report: new notes and answers (chapter 12).

OPTIONAL

Register

Do tasks in the mobile app: start a task, register the result and add photo and drawing evidence (chapter 11).

Tasks are open to everyone

A task is not given to one person. When R2 clicks Assign task, every task on the report is open to everyone on it with Register.

The report completes itself

When all tasks are submitted in the app, the report is Ready and R1 gets the payment link. There is no review or signing step.

Late tasks become deviations

A task that is not done by its completion date moves to the Deviations tab automatically (page 42).

How a report moves

Every report passes through six statuses. You see them as counters on the site dashboard (page 30) and in the report repository.

1

Draft

R1 · R2

The site and report are being set up. The task plan is kept as a draft.

2

Assign

R2

The tasks are assigned: open to the field user and everyone with Register.

3

Execution

R5

Someone is working on the tasks in the mobile app.

4

Ready

R5

All tasks are submitted in the mobile app. R1 gets a notification with a payment link.

5

Final

R1

All tasks are completed and the report waits for R1 to pay.

6

Paid

R1

R1 has paid the invoice. Generate Report, then Download, on the web.

After payment

Generate Report compiles everything into one PDF, however long it is. Then Download Report is enabled (page 61).

Lite limits

5 running sites or projects at the same time, and 2 running reports in each site.

Making room

When the 2 reports of a site are paid, you can start a 3rd report in that site, or create another site. Archiving is for sites, not reports: the company admin can archive a site.

Choose your profession type

The profession type decides which control plans and control points your company gets. Decide before you start, because the default profession is locked once it is saved.

DEFAULT PROFESSION

Construction companies

Pick your trade from the master data library, for example Blacksmith / Metal Worker.

USE GLOBAL

Control plans and control points maintained in Assurement, ready to use.

USE YOUR OWN

Write custom control points in the report (page 49). Master data cannot be changed.

EXTRA PROFESSION

Everyone outside construction

Advisor, Realestate, Process engineers, Private or Others. You bring your own control points. The reporting flow and the roles are the same.

Setup checklist

The order that gets a new company from sign-up to its first finished report. Click a page number to go to the step.

  1. 01R1Create the company account and log in
  2. 02R1Choose company access: single person or company
  3. 03R1Set the default or extra profession (locked once saved)
  4. 04R1Invite your project managers (R2) and field users (R5)
  5. 05NewInvited users accept the invitation and get the app
  6. 06R1Create the site or project and add its participants
  7. 07R1Invite external stakeholders with the right permissions
  8. 08R2Upload the documents and drawings for the site
  9. 09R2Give each drawing a floor level
  10. 10R2Choose the professions for the site
  11. 11R2Create the report: module, ID, title, description, drawings
  12. 12R2Add the people who will do the tasks to the report
  13. 13R2Tick the task types and choose the profession source
  14. 14R2Fill in the task forms, then click Assign task to release them
  15. 15R5Do the tasks on site and add photo and drawing evidence
  16. 16R1Report Ready: pay from the notification link, then generate and download it
01

Sign up and log in

Create the company account, log in, reset your password and choose the language.

1.1

Create your company account

Wie
R1Company admin
Waar
Login screenSign up

The first person from your company signs up. Everyone else is invited later from inside Assurement, so they never need this form.

  1. Open the Sign up tab

    On the login screen, click Sign up.

  2. Choose the account type

    Private if you work alone. Business if several people in the company will use Assurement.

  3. Fill in your details

    Full name, address, ZIP and city. A profile photo is optional.

  4. Finish the form

    Enter your industry, then scroll down to add email, phone and password and complete the sign-up.

1.2

Log in

Wie
AllEvery user
Waar
Login screen

Use the same screen every day. Your role decides what you see after you log in.

  1. Stay on the Login tab

    It is selected when the screen opens.

  2. Enter your email

    The address you signed up or were invited with.

  3. Enter your password

    Click the eye icon to show what you typed.

  4. Forgot it?

    Click Forgot password? See page 13.

  5. Click Sign in

    You land on your dashboard.

1.3

Reset your password

Wie
AllEvery user
Waar
Login screenForgot password?

Forgot your password? Ask for a reset link and choose a new one.

  1. Enter your email

    The address you log in with.

  2. Click Send reset link

    Open the email and follow the link to set a new password.

  3. Back to sign in

    Return to the login screen.

1.4

Switch to Danish

Wie
AllEvery user
Waar
Login screenSprog / Language

Assurement works in English and Danish. Choose the language at the top of the login screen.

  1. Choose the language

    Sprog / Language: Dansk or English. The screens switch to the language you choose.

  2. Log ind

    The Login tab. Tilmeld is Sign up.

  3. Glemt adgangskode?

    Forgot password?, as on page 13.

  4. Log ind

    The Sign in button.

02

Master data

Professions, control plans and control points from Assurement.

2.1

Open Master Data

Wie
R1Company admin
Waar
Company menuMaster Data

Master Data is the library behind every report: professions, control plans, control points, building parts and stakeholders.

  1. Click Master Data

    It sits in the company menu on the left, under Settings and Users.

2.2

Find your way in Master Data

Wie
R1Company admin
Waar
Company menuMaster Data

Three layers and five registers. The breadcrumb always tells you which layer you are looking at.

  1. Choose the layer

    Global (R0) is the library Assurement provides. Company (R1) and Site/Project (R2) follow below it.

  2. Check the breadcrumb

    Global (R0) › Company (R1) › Site/Project (R2). The highlighted part is where you are.

  3. Pick a register

    Professions, Control Plan, KP Control Points, Building Parts or Stakeholder.

  4. Filter by profession

    Show only the plans or points of one trade.

2.3

Profession, control plan, control point

Wie
R1Company admin
Waar
Master DataProfessions / Control Plan / KP Control Points

Three linked registers. Choose a profession and its control plans and control points come with it.

  1. Profession

    The trade, for example PR100 Work with Soil. 12 in the global library.

  2. Control plan

    What the trade must control, for example PR10 Work with soil. 30 in the global library.

  3. Control point

    The single check, with acceptance criteria, control class and method, for example KP0.01. 663 in the global library.

03

Company settings

Company access and the default or extra profession.

3.1

Choose company access

Wie
R1Company admin
Waar
Company menuSettings

Decide who can sign in to your company.

  1. Single person company

    Only company admins can sign in. Choose this if you work alone.

  2. Company

    Each user signs in with their own role and permissions. Choose this if you have a team.

3.2

Set the default profession

Wie
R1Company admin
Waar
Company menuSettingsProfession

For construction companies. The profession brings its control plans, control points and building parts with it.

  1. Select Default Profession

    Use this when your trade is in the master data library.

  2. Pick your profession

    Open the list and choose it, for example Blacksmith / Metal Worker.

  3. Click Save profession

    Check your choice first.

3.3

Or choose an extra profession

Wie
R1Company admin
Waar
Company menuSettingsProfession

For companies outside construction, such as advisors or real estate. You then bring your own control points.

  1. Select Extra Profession

    The category list appears.

  2. Pick a category

    Advisor, Realestate, Process engineers, Private or Others.

  3. Click Save category

    Your company is now set up.

04

Company dashboard and inviting your team

The company dashboard and how to invite users.

4.1

Know your company dashboard

Wie
R1Company admin
Waar
Dashboard

Your home screen as company admin. Everything you own is one click away from here.

  1. Company menu

    Settings, Users, Master Data, Plan & Billing, All Sites/Projects, Reports and Activity Log.

  2. New Site/Project

    Starts the site wizard in chapter 5. It is always in the top bar.

  3. Cart

    Shows reports waiting to be paid. See chapter 13.

  4. Quick actions

    Create Site/Project does the same as the top button.

  5. Invite User

    Invite your project managers (R2) and field users (R5) now, before you create a site.

4.2

Invite your team

Wie
R1Company admin
Waar
Company menuUsersInvite User

User Management lists everyone in the company. Invite colleagues and stakeholders from here, before you create a site.

  1. Open Users

    In the company menu on the left.

  2. Click Invite User

    The invite window opens.

  3. Invite type

    Internal for colleagues such as project managers (R2) and field users (R5). External for stakeholders outside the company.

  4. Stakeholder type

    For external users only, for example C22 Advisor.

  5. Access permissions

    Read is always on: view only. Communicate: write in the communication notes. Register: do tasks in the mobile app.

  6. First name, last name, email

    The invitation goes to this email.

  7. Click Send Invitation

    The user shows as Invited until they accept.

05

Create a site or project

The site wizard, licence, participants, invitations and the site list.

5.1

Enter the site details

Wie
R1Company admin
Waar
New Site/ProjectStep 1 of 3

The first of three short steps. Fields with a red star are required.

  1. Site/Project Name

    For example Harbour Tower.

  2. Start date

    Pick it from the calendar.

  3. Code

    Leave it empty. Assurement generates the code.

  4. Address

    Street, country, zip code and city.

  5. Contact person

    Name, email and phone of the person on site.

  6. Click Continue

    Go to step 2.

5.2

Confirm the licence

Wie
R1Company admin
Waar
New Site/ProjectStep 2 of 3

Lite allows 5 running sites or projects at the same time. Each new site uses one of them.

  1. Tick the confirmation

    You confirm the company holds a valid licence for this site.

  2. Click Continue

    Go to step 3.

5.3

Add the people

Wie
R1Company admin
Waar
New Site/ProjectStep 3 of 3

Pick colleagues from your company. Their role on the site follows their account.

  1. Role

    For example R2, the project manager.

  2. Pick the person

    Choose from the list, for example Lars Jensen.

  3. Add participant

    Add another row for the next person.

  4. Invite user

    Someone not in the list yet? Invite them. See the next page.

  5. Click Create Site/Project

    The site is created.

5.4

Invite a user

Wie
R1Company admin
Waar
Step 3+ Invite user

Invite stakeholders from outside the company, or colleagues who have no account yet.

  1. Invite type

    External for people outside the company. Internal for colleagues.

  2. Stakeholder type

    Their named external role, for example C22 Advisor. See the list on the Who does what page.

  3. Permissions

    Read is always on: view only. Communicate: write in the communication notes. Register: do tasks in the mobile app.

  4. First name, last name, email

    The invitation goes to this email.

  5. Click Send Invitation

    The invitation goes to the email address.

5.5

The invitation email

Wie
NewInvited user
Waar
The invited person's inbox

This is what the invited person receives. Share this page with new users so they know what to do.

  1. Who invited you

    The person and the company workspace you are joining.

  2. Act within 24 hours

    The invitation expires after that. Ask for a new one if it does.

  3. Scan the QR code

    With your phone, to open the Assurement app.

  4. Download the app

    From Google Play or the App Store.

  5. Open in Assurement

    Opens the invitation so you can activate your account.

5.6

Accept the invitation

Wie
NewInvited user
Waar
InvitationAccept your invitation

The invited person sets a password and completes their profile to activate the account.

  1. First and last name

    Phone is optional.

  2. Password

    Type it twice.

  3. Password requirements

    At least 12 characters, upper and lowercase letters, a number and a special character.

  4. Education / Certification

    Add a description for each row. Documents are optional. Add Row adds another.

  5. Experience

    Same as education: a description per row, documents optional.

  6. Click Activate account

    The account is ready. Log in as on page 12. The login in the mobile app looks and works the same.

5.7

Find your site

Wie
R1Company admin
Waar
Company menuAll Sites/Projects

Every site and project of the company, with status, reports and participants.

  1. Filter

    All, Active, Blocked, Completed or Archived. Archived sites are sites the company admin has archived.

  2. Edit

    Change the site details.

  3. View More

    Opens the site dashboard. This is where the project manager takes over.

06

Site dashboard, documents and drawings

Upload documents and drawings, floor levels and professions for the site.

6.1

Know the site dashboard

Wie
R2Project manager
Waar
All Sites/ProjectsView More

One page for everything about one site: its reports, details, users and contacts.

  1. Report counters

    How many reports are in each status. See the page How a report moves at the start of the manual.

  2. Add / Invite user

    Add more people to this site.

  3. Add Contact

    Keep the site contact list up to date.

  4. New report

    Starts a report. Do this after pages 31 to 33.

6.2

Upload documents and drawings

Wie
R2Project manager
Waar
Site dashboard4. Document upload / 5. Drawings upload

Upload once, and every report on this site can use the files.

  1. Upload document

    Inspection reports, colour codes, building part lists.

  2. Upload drawing

    Plans and sections for the site.

  3. Check the preview

    Each file shows as a card. Delete removes it.

6.3

Give each drawing a floor level

Wie
R2Project manager
Waar
SiteDrawings

Drawings are grouped by floor level. Every drawing must be assigned to a floor level.

  1. Upload drawing

    Add a new drawing to the site.

  2. Level

    Shows -- until the drawing has a floor level.

  3. View

    Open the drawing. Remove deletes it.

  4. Click Assign level

    Choose the floor level the drawing belongs to.

6.4

Choose the professions

Wie
R2Project manager
Waar
Site dashboard6. Profession selection

The company default profession is already selected. Add more if other trades work on the site.

  1. Profession source

    Default Profession or Extra Profession, as set in Company settings.

  2. Tick more professions

    The default stays selected.

  3. Click Save professions

    Discard undoes your changes.

  4. Check what is loaded

    For example 3 plans, 1 building part and 37 control points.

  5. Latest reports

    Search the reports of this site.

07

Create a report

The six-step report wizard.

7.1

Choose module and report ID

Wie
R2Project manager
Waar
Site dashboardNew reportStep 1 of 6

A guided wizard in six steps. The dots at the top show where you are. A site can have 2 reports running at the same time.

  1. Choose module

    Select Lite Report.

  2. Report ID

    Type an ID that is unique in your company.

  3. Click Continue

    Go to step 2.

7.2

Give the report a title

Wie
R2Project manager
Waar
New reportStep 2 of 6

The title is what the team sees in lists and on the phone.

  1. Report ID

    It follows along at the top of every step.

  2. Report title

    For example Functional test, basement.

  3. Click Continue

    Go to step 3.

7.3

Add the report participants

Wie
R2Project manager
Waar
New reportStep 3 of 6

Choose who works on this report. Tasks are open to everyone on the report with the Register permission, so add all the people who may carry them out.

  1. Invite type

    Internal for colleagues. External for stakeholders.

  2. Add an existing participant

    Pick a colleague who already has an account.

  3. Or invite a new user: role

    For example R2 Project Manager, or the field user role.

  4. Email

    Where the invitation goes.

  5. Click Send Invite

    Valid for 24 hours. The new user follows pages 27 and 28.

  6. Report participants

    Everyone on the report. You are listed as a predefined participant.

  7. Click Continue

    Go to step 4.

7.4

Describe the report

Wie
R2Project manager
Waar
New reportStep 4 of 6

Tell the field team what the report covers before they start.

  1. Report description

    What is checked, where, and why.

  2. Watch the word count

    Up to 1000 words.

  3. Click Continue

    Go to step 5.

7.5

Pick the drawings

Wie
R2Project manager
Waar
New reportStep 5 of 6

Choose from the drawings you uploaded on the site dashboard.

  1. Tick one or more drawings

    For example A.01.3 Koter.

  2. Missing one?

    Click + Add drawing, then Refresh.

  3. Click Continue

    Go to the last step.

7.6

Tick the task types

Wie
R2Project manager
Waar
New reportStep 6 of 6

Tick the kinds of task this report needs. Each one becomes work for the field user.

  1. Tick the task types

    Checklist type 1 or 2, Registration type 1 or 2. All are optional.

  2. Create Report

    Click it after you have chosen the profession source on the next page.

7.7

Choose the profession source

Wie
R2Project manager
Waar
New reportStep 6 of 6

As soon as you tick a task type, Assurement asks where the control points should come from.

  1. Ticked task types

    The source question appears below them.

  2. Choose the source

    Global: the master data library from Assurement. Company: your company's control points. Extra: your extra profession. You can always add custom control points later (page 49).

08

Report overview and deviations

The report overview and following up on deviations.

8.1

Know the report overview

Wie
R2Project manager
Waar
Report Overview

The home of one report. Every area of the report opens from here.

  1. Status

    Pending, In Progress, Completed and the total number of tasks.

  2. Tasks

    Add and follow the tasks. Chapter 9.

  3. Deviations

    Tasks that ran past their completion date, or were marked deviated in the app.

  4. Communication Notes

    Talk with the team about this report. Chapter 12.

  5. Back

    Return to the site.

8.2

Follow up on deviations

Wie
R2Project manager
Waar
Report OverviewDeviations

Everything that did not go as planned, in one place. You do not need to move anything here yourself.

  1. Task deviations

    A task that is not done by its completion date has a time deviation and moves here automatically. Deviations raised in the mobile app are listed here too.

  2. MOBILE

    The deviation was raised from the mobile app.

  3. Type and date

    For example automatic overdue, with the date and the original due date.

  4. View

    Open the task to see what happened.

  5. Overdue tasks

    Tasks whose completion date has passed, with the report and the date.

  6. Back

    Return to the report overview.

09

Add tasks

Checklists, registrations, control points and Assign task.

9.1

Open the report tasks

Wie
R2Project manager
Waar
Report OverviewTasks

Every task type you ticked in the report wizard is listed here. Each one has its own form, and Assign task releases the work to the field.

  1. Access as

    Shows the role you are working as, here R2 (Project Manager).

  2. Task types

    The types chosen for this report. Each opens its form on the next pages.

  3. Task count

    How many tasks of each type exist. 0 tasks means the form is still empty.

  4. Report Preview

    See how the report will look.

  5. Assign task

    Releases the tasks to the field. Tasks are not given to one person: they are open to everyone on the report with the Register permission. Fill in the task forms first.

  6. Back

    Return to the report overview.

9.2

Checklist type 1

Wie
R2Project manager
Waar
Report tasksChecklist type 1

The simple checklist needs a title, a date and a description.

  1. Title

    What the checklist is about.

  2. Completion date

    When the task must be done.

  3. Checklist description

    What the field user must check.

  4. Add task

    Add another task to the same checklist.

  5. Click Create task

    Back to report tasks takes you to the list.

9.3

Checklist type 2

Wie
R2Project manager
Waar
Report tasksChecklist type 2

The structured checklist, with room, scope, time and what counts as accepted.

  1. Title

    What the checklist is about.

  2. Completion date

    The control ID and date are filled in for you.

  3. Description

    What to check.

  4. Room, scope and time

    Where, how much in percent, and at what time.

  5. Accept

    The acceptance criteria the work must meet.

  6. Click Create task

    Or Add task first for another one.

9.4

Registration type 1

Wie
R2Project manager
Waar
Report tasksRegistration type 1

The quickest way to register something on site.

  1. Title

    A short name for the registration.

  2. Completion date

    When it must be done.

  3. Control ID

    Filled in for you.

  4. Subject/description

    What happened or what must be registered.

  5. Click Create task

    Add task first if you need more.

9.5

Registration type 2 from a control plan

Wie
R2Project manager
Waar
Report tasksRegistration type 2

Build tasks straight from the control plans of the site's profession.

  1. Task source

    Global control point uses the library. Custom control point is on page 49. Extra profession control point is for extra professions.

  2. Title

    A name for this set of tasks.

  3. Selected profession

    Shown for you, for example Work with Soil.

  4. Completion date

    When the tasks must be done.

  5. Pick a control plan

    For example PR10. Its control points load below.

9.6

Pick control points and building parts

Wie
R2Project manager
Waar
Registration type 2Control points

Each ticked control point becomes one task for the field user.

  1. Tick the control points

    Each shows its number, label, control type, activity and time window.

  2. Tick building parts

    At least one and at most two.

  3. Click Save Changes

    The tasks are created.

9.7

Write your own control point

Wie
R2Project manager
Waar
Registration type 2Custom control point

Not using the control plans and control points from Assurement? Write your own custom control point here, in the report. Master data itself cannot be changed.

  1. Control Plan Name

    The plan this check belongs to.

  2. Control Type and number

    For example Process and KP08.15.

  3. Activity

    What must be controlled, up to 300 characters.

  4. Building parts

    At least one and at most two.

  5. Click Add control point

    It joins the task selection right away.

10

Admin app

Follow every site from your phone.

10.1

Use the app as admin

Wie
R1Company admin
Waar
Assurement appHome

The admin workspace on your phone. Follow every site from anywhere.

  1. Six areas

    Site / Project, Report, Deviation, Users, Drawings and Documents.

  2. Language

    Switch between English and Danish.

  3. Site Progress

    Opens the progress screen.

  4. Change site

    Tap to pick another site.

  5. Progress

    Percent done, with completed, pending and deviated items.

11

Work in the field

The field user's app: tasks, photos, drawings and Submit.

11.1

See your work

Wie
R5Field user
Waar
Assurement appReport Dashboard

The field user sees the reports they are on. Every task on a report is open to everyone on it with the Register permission.

  1. Task completion

    How far the report is, in percent.

  2. Totals

    Total, pending, deviated and completed tasks, and drawings.

  3. Tasks

    Tap to see your task list.

  4. Task status

    Completed, Pending, In Progress and Deviated.

  5. Continue a task

    The task you are working on is at the top.

11.2

Start a task

Wie
R5Field user
Waar
Report DashboardTasks

Open the task to read what must be checked, then start it.

  1. Status

    Assigned, In Progress or Completed.

  2. Start task

    Or Open task to read it first.

  3. Read the details

    Completion date, control plan, control type, control point and activity.

  4. Building part

    Where on the building the check belongs.

11.3

Add photo and drawing evidence

Wie
R5Field user
Waar
TaskMark image / Mark drawing

Photos are stamped with date, time and GPS. Draw on them to show what you found.

  1. Date and GPS

    Added to every photo automatically.

  2. Pencil

    Pick a colour and draw. Eraser removes marks.

  3. Save image

    The photo is stored with the task.

  4. Mark the drawing

    Circle the spot where you did the check.

  5. Save drawing

    The marked drawing is stored with the task.

  6. Tap Submit

    At the end of the task. The task is then completed. Not shown on the screens above.

12

Communication notes

Write, read and answer notes on a report.

12.1

Write a note

Wie
AllEveryone with Communicate
Waar
ReportCommunication Notes, or Notes in the app

Every report has one conversation. Everyone on the report can read it. Only users with the Communicate permission can write.

  1. New general note

    Tap to open the form.

  2. Title

    What the note is about.

  3. Category

    Tap to open the list.

  4. Pick a category

    Reminder, Formal notice, Urgent, Confirmation, Action required, Agreement or Causes delay.

  5. Write the message

    To the team of the report.

  6. Add attachment

    Images, PDF, Word or CSV. Optional.

  7. Send note

    The team receives it.

12.2

Read and answer

Wie
AllEveryone with Communicate
Waar
Communication NotesTeam communication

Questions and answers stay with the report as part of its record.

  1. Filter

    All, Sent, Received or Drafts.

  2. Search

    By subject or text.

  3. Category

    Shows the tone before you read.

  4. Attachment

    Tap to open it.

  5. The answer

    Replies appear on top, with sender, role and date.

13

Pay for a report

Invoices, the cart, card payment and the invoice PDF.

13.1

Find the invoice

Wie
R1Company admin
Waar
Notificationpayment link, or Company menuPlan & Billing

When all tasks of a report are submitted, the report is Ready and the company admin gets a notification with a payment link. The link opens the invoice here, on the web. One invoice per report, 149 DKK plus VAT.

  1. Search

    By site or project name, or filter by issued date.

  2. Status

    Unpaid, Paid or Written Off.

  3. Add to Cart

    For an unpaid invoice. View opens the invoice.

  4. Cart

    The badge shows how many are waiting.

13.2

Pay from the cart

Wie
R1Company admin
Waar
Top barCart

Pay one or more reports together.

  1. Hover the cart

    The billing cart shows what is in it.

  2. Click the cart

    The invoice cart opens.

  3. Select the reports

    Tick the ones to pay. The bin removes one.

  4. Check the total

    Subtotal, 25% VAT and total. 149 DKK becomes 186.25 DKK.

  5. Click Checkout & Pay

    The card payment page opens.

13.3

Pay by card

Wie
R1Company admin
Waar
Invoice CartCheckout & Pay

A secure card payment page from Flatpay. It is in Danish, and the amount includes VAT.

  1. I alt

    The total to pay, 186,25 DKK for one report. Vis detaljer shows the details.

  2. Kortnummer

    Your card number. Visa, Visa Electron, Mastercard and Maestro are accepted.

  3. Udløbsdato

    Expiry date, MM / ÅÅ.

  4. Kontrolcifre

    The 3 digit security code on the back of the card.

  5. Click Betal

    Pay. The report status changes to Paid, and Generate Report becomes available (page 61).

  6. Afbryd

    Cancel and go back without paying.

13.4

View and download the invoice

Wie
R1Company admin
Waar
Plan & BillingView

Every invoice can be printed or downloaded as PDF.

  1. Payment due

    An unpaid invoice has Add to Cart right next to the notice.

  2. Print or download

    Print, or Download Invoice PDF next to it.

  3. Total due

    149.00 DKK, VAT 37.25 DKK, total 186.25 DKK.

  4. Back to Billing

    Return to the invoice list.

14

Get the final report

Preview, generate and download the report.

14.1

Preview the report

Wie
R1Company admin
Waar
ReportsPreview

Check the report for free at any time. Names and contact details stay hidden until the report is paid.

  1. The notice

    Names and contact details are hidden until payment.

  2. Masked values

    Shown as stars, for example met****.

  3. Close preview

    Back to the list.

14.2

Download from the repository

Wie
R1Company admin
Waar
Company menuReports

Every report and every version in one library. Generate Report is available on the web only, after the report is paid.

  1. Filter

    By status, site, report name, date or version, then click Apply Filters.

  2. Preview

    Available for every report.

  3. Generate Report

    After payment. The report is compiled into one PDF, however long it is. Generating again creates a new version, v1, v2 and so on.

  4. Download Report

    Enabled once the PDF is generated.

14.3

The finished report

Wie
R1Company admin
Waar
ReportsDownload Report

Everything registered in the field is bound into the Lite report template and compiled into one PDF, with names and contact details shown.

  1. Project information

    Site, address, contractor, sender and recipient.

  2. Participants

    Everyone on the report, with role and email.

  3. Approved

    The result of each task.

  4. Task results

    One section per task type: checklists and registrations with their details.

15

Quick reference

I want to… with the page for every common task.

Quick reference

  • Create the company account

    R1Company adminLogin screenSign up
  • Reset a forgotten password

    AllEvery userLogin screenForgot password?
  • Set the company profession

    R1Company adminCompany menuSettings
  • Invite a colleague

    R1Company adminCompany menuUsersInvite User
  • Create a site or project

    R1Company adminTop barNew Site/Project
  • Invite a user or stakeholder

    R1Company adminStep 3+ Invite user
  • Upload drawings for a site

    R2Project managerSite dashboardUpload drawing
  • Create a report

    R2Project managerSite dashboardNew report
  • Add people to a report

    R2Project managerNew reportStep 3
  • Add tasks to a report

    R2Project managerReport OverviewTasks
  • Follow up on deviations

    R2Project managerReport OverviewDeviations
  • Do a task in the field

    R5Field userAppReport DashboardTasks
  • Write a communication note

    AllEveryone with CommunicateReportCommunication Notes
  • Pay for a report

    R1Company adminNotificationpayment link
  • Generate and download the report

    R1Company adminCompany menuReports

Kom je er niet uit?

Bel ons op +45 31 41 81 38, maandag tot en met vrijdag 8:00–16:00, of stuur ons een bericht en we helpen je verder.