Free deviation report template
The deviation report is a free Excel template for recording and following up deviations on site, when work has not been done as planned. For each deviation you record what is wrong, a photo and the marking on the drawing, the solution, who fixes it, the due date and the follow-up check. All deviations are collected in a log that shows what is still open and what is past its due date.
Excel (.xlsx) · works in Excel, Google Sheets and Numbers · free, no account

What's in the template
- One report per deviation: site, report, trade, control point, building part, photo ref. and marking on drawing
- Fields for description, requirement/reference and solution
- Questions on load-bearing structures and DS1140
- Responsible, due date, fix, follow-up check and status (Open / Being fixed / Closed)
- A deviation log that flags deviations past their due date
- Instructions on the first tab
How to fill it in
- Fill in one report per deviation, and copy the tab for each new one.
- Describe briefly what is wrong and note the requirement/reference, photo ref. and marking on the drawing.
- Record the solution, who fixes it and the due date.
- When it is fixed: record the follow-up check and close it.
- Copy the deviation into the deviation log.
Deviations that could affect load-bearing structures
The template asks whether the deviation could affect load-bearing structures. If the answer is yes, or you are unsure, a qualified person must assess it before work continues. If the deviation is linked to a point in the DS1140 control plan, it must also appear in the B3 control report.
What you can do on mobile today
In Lite Report the worker documents their task with photos, markings and a comment, and problems on site can be raised in the report's communication notes, where you can attach photos and files. If a task's milestone passes without the task being done, the system raises a time deviation automatically. A deviation itself can't be marked on the drawing in Lite Report yet: that comes with the DS1140 module, launching soon, and the quality assurance module, in development.
See all the free templates for control plans, quality assurance and deviations.
Frequently asked questions
Is the template free?
Yes. You can download it without creating an account.
Should every deviation be recorded?
We recommend recording every deviation that affects quality or the schedule, including small ones, so you can show that they were fixed.
What if a deviation could affect load-bearing structures?
Stop the affected work and have it assessed by a qualified person before continuing. Note in the report who assessed it.
How does the report link to the QA checklist?
A control point with status “Not OK” in the QA checklist is recorded as a deviation here.